GHST KTCHN
Build Configurator
Running Total £0
Click any underlined field to edit it. Sign at the bottom of the last page before printing.
GUIDED BUILD PROPOSAL
GUIDED BUILD
PROPOSAL
A custom build proposal for your business
Prepared For
Prepared By
GHST KTCHN
Reference
GUIDED BUILD PROPOSAL
Welcome

Welcome to your guided build proposal.

Inside this proposal you'll find a full breakdown of your selected trailer, fit-out package, equipment and finishing options, along with pricing, our standard build timeline and payment terms.

Every GHST KTCHN™ build is modular and tailored around how you plan to trade, your operational requirements, service style and future growth plans. If anything below doesn't match what you had in mind, let us know — specs can be revised any time before sign-off.

Who We Are

GHST KTCHN™ designs and manufactures premium modular mobile hospitality systems for brands, operators and growing food businesses.

Combining fabrication, commercial kitchen design and creative build expertise, we deliver tailored solutions built for modern street food, events and hospitality environments. From custom trailers and trucks to scalable activation and retail concepts, every build is designed to perform, adapt and stand out.

GUIDED BUILD PROPOSAL
Your Investment

Here is an overview of the items selected for your build, including trailer model, fit-out package and any additional upgrades.

ProductPriceQtySKUTotal
Subtotal (ex. VAT)£0
VAT (20%)£0
Total (inc. VAT)£0
Payment Schedule
30%
On Order
£0
30%
On Body Build
£0
40%
On Completion
£0
Representative Finance Option
£0 /month

Financing example unavailable.

Representative example for illustration only — not a credit offer, quote, or financial advice. Actual rate, term and monthly cost depend on the lender, deposit structure and applicant's credit status.

This proposal is valid until . Prices exclude delivery unless otherwise agreed in writing.

GUIDED BUILD PROPOSAL
Timeline Overview

Our standard build timeline is approximately 12 weeks from sign-off to completion. Each stage is completed in-house to ensure the trailer is built to commercial standards and fully prepared for handover or delivery.

WeekStageWhat Happens
Week 1Kick-offBegins once the proposal is signed and deposit received; moves into design phase.
Wk 2–3Design & SpecificationWe develop the trailer around the requirements in this proposal.
Week 4Client ApprovalOne week to review and approve layouts, specifications and design details.
Week 5ManufacturingTrailer moves into production — fabrication and structural works begin.
Week 6ProcurementMaterials, components and equipment are ordered and prepared.
Week 7Build the BodyMain trailer structure assembled — chassis, framework, external body.
Week 8Build Fit OutInternal build — worktops, storage, equipment, electrical systems installed.
Week 9Branding & FinishingBranding application, finishing touches and final visual preparation.
Week 10QC & Handover ReadyFinal inspections, system testing and operational checks.
Week 11Delivery & HandoverCompleted trailer prepared for collection or delivery, documentation provided.
Week 12Post DeliveryPost-delivery check-in to confirm everything is operating correctly.

Any amendments requested outside the Week 4 approval window may delay the overall project timeline.

GUIDED BUILD PROPOSAL
Agreement

By signing below, (GHST KTCHN) and agree to the specification and pricing set out in this proposal, and form a contractual agreement that begins upon the date of signing.

Any changes to specification after sign-off will be issued as a written change order and may affect price and timeline. Full Terms & Conditions are provided separately for review and signature ahead of production.

GHST KTCHN — Signature
Name:
Date:
Customer — Signature
Name:
Date: